Do I need a 200 amp service for an EV charger?
Not necessarily. Many homes charge an EV on a 100, 125 or 150 amp service. Whether yours can depends on its existing loads, which a load calculation shows. A 200 amp service is common when a home needs an upgrade anyway, but it is not a requirement for charging.
Can I just install a smaller charger instead of upgrading?
Often, yes. Many chargers can be set to a lower current, which lowers both the breaker size and the load on the service. A 24 or 32 amp setting still covers typical daily driving overnight for most households. The electrician sets it to match the circuit.
What is the difference between a panel upgrade and a service upgrade?
A panel upgrade replaces the breaker panel, sometimes at the same rating. A service upgrade raises the amount of power the house can draw, which usually means a new meter base, main and service conductors, and involves the utility. An EV project may need either, both or neither.
Does KRW handle the permit? What about the utility?
KRW pulls the permit and schedules the inspection with your building department. On a service upgrade the utility sets its own scope and schedule; we explain what it involves and plan the work around the disconnect and reconnect.
Will my power be off during a service upgrade?
Yes, for part of the work. The service has to be disconnected while the new equipment is installed and inspected before it is reconnected. The timing is planned with you and the utility in advance.
Is load management allowed under Florida's code?
Florida is on the 2020 NEC, which allows adjustable charger settings on fixed equipment when access to the setting is restricted. How a building department credits other load-management devices in the calculation is its call, so we confirm before the equipment is ordered.