Related reading
Guides and pages that go further on this work.
Questions we are asked about this
Do you handle the electrical permit on a new home?
Yes. KRW Electric handles the electrical permit and the electrical inspections on our jobs. How the electrical permit relates to the building permit depends on the building department; in many departments it is a sub-permit under the master permit.
Do you provide the electrical engineering?
No. Where a building department requires engineered electrical drawings, they come from a licensed engineer of record. We work from the approved plans and help with load planning and circuit layout alongside the architect.
What do you need to price a new home?
The plans with electrical sheets, the site plan, the equipment list with nameplate data, the flood zone and required elevation, which utility serves the lot, and the construction schedule.
Which code applies to a home permitted now?
Florida's 8th Edition building code, which adopts the 2020 National Electrical Code. The 9th Edition, with NEC 2023, is proposed to take effect December 31, 2026 and is not yet adopted. Ask the building department which edition applies to your application.
How does FPL fit into the schedule?
The FPL project application is made through FPL's Project Portal. We build the customer side of the service to FPL's standards and get it inspected, and FPL energizes after the local inspection.
Which areas do you cover?
Miami-Dade, Broward and Palm Beach counties. KRW Electric is based in Miami Beach and holds Florida certified electrical contractor license EC13012832.