Related reading
Guides and pages that go further on this work.
Questions we are asked about this
How many EV chargers can our building add without a service upgrade?
It depends on the existing service, what the building actually draws and whether the chargers use load management. A load calculation against demand history answers it. Managed Level 2 charging often fits more chargers on an existing service than people expect.
Should we install Level 2 or DC fast chargers?
Match it to how long vehicles stay. Offices, condos, apartments and hotels usually need Level 2. Retail stops and fleets with quick turnaround may need DC fast charging, which usually means a service upgrade and early utility coordination.
Can our condo association stop an owner from installing a charger?
Under section 718.113(8), Florida Statutes, a declaration or covenant may not prohibit a unit owner from installing a charger in their limited common element or exclusively designated parking area. The board can require code compliance, reasonable architectural standards, licensed installers and insurance, and the owner pays for the installation and the electricity.
Who pays for the electricity for a condo owner's charger?
The unit owner. The statute requires the charger to be separately metered or metered by an embedded meter and paid by the owner who installed it (s. 718.113(8)).
Does FPL help pay for commercial EV charging?
FPL lists a Make-Ready Credit program for utility-side infrastructure at eligible public, workplace, fleet and multifamily sites, with funding on a first-come, first-served basis. It does not cover the chargers themselves. Check current availability with FPL.
Can a city require its own rules for our charging station?
Florida preempts EV charging station regulation to the state. Under section 366.94, local governments issue permits based on state standards rather than their own EV charging ordinances. You still need a building permit for the electrical work.
Do EV charging spaces have to be accessible?
The U.S. Access Board has published recommendations for accessible EV charging and says it intends to propose specific guidelines. Your design team and the building department decide what applies to your site; plan the accessible space at design stage.
Is this the same service as your home EV charger installation?
No. This page covers commercial, workplace, fleet and multifamily charging. For a single charger at a house, see home EV charger installation.
Florida EV charging guides
Plain answers on chargers, panels, permits, condos and storms for South Florida homes, from a licensed electrical contractor.