Questions we are asked about this
Who issues a commercial electrical permit in Miami-Dade?
It depends on the address. Each of Miami-Dade's municipalities has its own building official; the county issues permits for unincorporated areas, identified by folio numbers beginning with 30. See the county's permit application page.
Can a business owner pull the electrical permit for a commercial build-out?
Generally the licensed electrical contractor doing the work pulls it. Miami-Dade issues permits in the name of the person performing the work, to licensed contractors or qualifying owner-builders. Ask the building department about owner-builder rules before assuming they apply to commercial work.
What does an electrical permit application need for commercial work?
Usually the permit application, the contractor's license information, and drawings: riser diagram, load calculations, panel schedules, lighting and energy code documentation, and available fault current. Requirements vary by department and by the size of the job; see the section above on engineered drawings.
Does commercial electrical work need an engineer's drawings?
Above the limits in section 471.003(2)(h), Florida Statutes, including a commercial service capacity of 800 amperes at 240 volts, yes. Below them, many departments still require drawings for commercial work. Check with the department that has jurisdiction.
What is checked at a rough in electrical inspection?
Everything that will be hidden once walls and ceilings close: boxes and their support, raceways and fittings, cables and conductor sizes, grounding, and sealed penetrations through rated assemblies. The inspection has to pass before insulation or drywall goes up.
What is a private provider?
A licensed engineer, architect or building code administrator hired by the owner, or by the contractor with the owner's authorization, to do plan review, inspections or both under section 553.791, Florida Statutes. The local building department still issues the permit and must be notified.
Is Palm Beach County in the High-Velocity Hurricane Zone?
No. The Florida Building Code's High-Velocity Hurricane Zone is Miami-Dade and Broward. Palm Beach County is designed to the statewide wind provisions of the same code.
The previous tenant left an open electrical permit. What now?
Florida law lets the property owner close it with the original contractor or a different licensed contractor, who is liable only for their own work (section 553.79(16)). Search the permit history before design starts so it does not hold up your permit or CO.
Do you handle the electrical inspection in Miami?
For work we install, yes: we pull the electrical permit, schedule the inspections with the department that has jurisdiction, and correct anything the inspector flags. We don't act as a private provider or third-party inspector.