Related reading
Guides and pages that go further on this work.
- Vanilla Shell vs Turnkey Build-Out: What the Landlord Delivers Electrically and What You Still Need
- Tenant Improvement Allowance: How the Electrical Scope Fits and What to Price Before You Sign
- Getting Electrical Work Done Without Closing the Business
- Commercial lighting and controls
- Commercial remodel and tenant improvement electrical
Questions we are asked about this
Should we use power poles or floor boxes for open-plan desks?
It depends on the slab and the building. Poles are faster, cheaper and easy to move. Floor boxes look cleaner but mean core drilling or trenching, slab scanning on post-tensioned floors, and access to the floor below. Decide at layout stage.
How many workstations can share a circuit?
The engineer of record sets that from the equipment at each desk and the furniture's internal wiring. It varies with the furniture system and what people plug in, so it is not a number to apply from another job.
Does the server room need its own cooling circuit?
Usually. Racks run all night and building air conditioning often does not, so a dedicated cooling unit on its own circuit is common. The mechanical engineer sizes the unit; the electrical plan gives it a circuit and a disconnect.
Will our office alteration trigger energy code lighting controls?
It can. Florida's energy code includes occupant sensor, daylight-responsive and automatic receptacle control provisions, summarized in the FSEC report for the Florida Building Commission. How much of an alteration they reach depends on its scope, and the designer's energy compliance documents settle that.
Can the work be done after hours in a managed building?
Yes. Noisy work and shutdowns are commonly scheduled after hours or on weekends under the building's rules, with the building engineer involved for anything touching shared equipment.
Do you install the AV and network equipment?
KRW provides the power, pathways and low-voltage cabling. Displays, audio, video conferencing and network equipment are supplied and set up by the AV integrator and IT vendor.
What do you need to price an office build-out?
The electrical drawings or at least the floor plan, the furniture plan and its electrical spec, AV and IT requirements, the landlord's work letter or description of what is delivered, and the building's construction rules.