Related reading
Guides and pages that go further on this work.
Questions we are asked about this
Do you install the hood fire suppression system?
No. The suppression system is installed and tested by a licensed fire suppression contractor. KRW provides the electrical side: power to the hood controls and fans, shunt-trip breakers or contactors on the circuits feeding the protected cooking equipment, and the wiring from the suppression system's contacts to them, coordinated with that contractor.
Why does equipment under the hood need a shunt trip?
When the cooking fire suppression system discharges, the fuel and electrical power to the protected cooking equipment has to shut off automatically, with a manual reset. Inspectors check for this; see the Miami-Dade mechanical inspection guidelines. On electric equipment that is usually done with shunt-trip breakers or a contactor.
Can a restaurant switch from gas to induction without a service upgrade?
Sometimes, but it has to be calculated, not assumed. Induction and all-electric lines add large loads, and turning off the gas frees no electrical capacity. A load calculation against the actual equipment schedule answers it before anything is ordered.
Our equipment is 240V and the space is 208V. Is that a problem?
It can be. Equipment rated only for 240V will run at reduced output on 208V, and some will not run properly at all. Many manufacturers offer 208V versions, so the fix is usually ordering the right model once the building's voltage is confirmed.
What should we check before taking over an existing restaurant space?
Service size and panel space against your equipment list, whether the existing hood interlock actually works, the accuracy of the panel schedules, heat and grease damage above the line, and the condition of rooftop disconnects. Our restaurant build-out checklist goes through each.
Can electrical work be done while the restaurant stays open?
Most of it can, with shutdowns planned around service, prep and deliveries. Refrigeration is the usual constraint, so the sequence is planned around keeping walk-ins and reach-ins cold.
Do you run the cabling for POS, sound and cameras?
Yes, KRW runs low-voltage cabling for data, sound and cameras. The POS system, sound system and camera equipment come from their own vendors, who connect to that cabling.